Production / Location Eberstein

  OEKW&P

Production Centre Eberstein

The production facility in Eberstein has established itself in recent years as a competent industry partner in plant engineering, with emphasis on the cement industry.

The available services include:
Expertise Advice and Project Planning
Design Engineering: Structural Analysis, Detailed Design and Design for Production 
Production
Logistics and On-Site-Delivery
Assembly/Structural Erection or Supervision of Erection
System Commissioning
Documentation

Mechanical Servicing and Renovation/Update: in Cement Industry 365 days a year
Industrial System: Production, Delivery and Erection:
Silos: round and square/rectangular
Pressure Vessels and Containers
Piping and Pneumatic Conveying Systems
Cyclone, Particle extraction
Drying Systems
Powder Conveying Systems
System Components:
Hot-Gas Slide Valve
Flap Valve
Cooling Chamber
Feed Delivery Box  (Splash Box)
Oven-entry Sealing Systems

Structural Steelwork (as sub-sections or extensions systems)
Structural Steelwork
Stairways, Platforms, Ladders……
Steel Frame Buildings: - complete with walling, doors etc.


Resources:

Personnel: 
A team of  22 qualified mechanics and TUV Certified Welders, with production, assembly and erection experience – at home and abroad – worldwide.
Additionally, International Partners strengthen our workforce on several projects.

Production Workshop:
We have an 800m2 Production Facility with a rail travelling crane. CNC Bending Machine (Name etc….),
Plasma and Flame cutting facilities to 25 mm thickness and 6000 x 2500 sizes.

Geographic Project Areas:
Worldwide

References:  
Below is a list of some of our satisfied customers over the last three years:

Wietersdorf & Peggauer Cement Plant:
delivery, assembly, erection and commissioning of Preheater Tower 

Schretter & Cie: 
redesign of existing Preheater Tower

Leube Cement:
delivery and installation of a Bypass System

AMMAG:
delivery of Silos Storage System – round and rectangle

AE & E:
production, delivery and erection of Cyclones

Dolomit Eberstein: 
production and erection of a 60 m Shaft

Rohrdorfer Cement: 
redesign of Furnace Inlet Chamber

ABRG GmbH:  
redesign of the existing rotary oven, Production and assembly of a secondary oven chamber


 
 
Same celebration
 
Welding
 
Pipeline
Home
Login
Contact
Impressum